Aim
- To carry out the construction of the exhibition stand according to the customer's design project provided 2 weeks before the start of installation.
- Design a non-standard photo zone with 3D spatial illumination and an exclusive arch with the LED strip.
182 m²
Built-up area
12
Installers on shift
1
Hanging element
2
Floors of the stand
Exponic
2025
Result
- Originally the installation period was planned to be 4 full days, with the possibility of unloading from the night before the first day of mantling. Subsequently, the organizers reduced the installation period from 4 to 2 days. We found out about it on the eve of the installation.
- The construction of two-storey stands always takes more time than one floor expositions. Nevertheless, in a full two days, our team managed to surpass itself once again and do the job 100%. Even for the customer, it was a pleasant surprise that we were able to cope with a difficult object, with a large number of lighting elements, in such a short time. The result is in the photos!
- The project was implemented jointly with the Atomexpo company.